51³Ô¹ÏÍø

CHOKEPOINTS

Plan for traffic: WSDOT’s Thursday overnight work includes full SR 167 closure

Mar 27, 2025, 4:30 PM | Updated: 4:40 pm

Thursday overnight work...

Outline of SR 167 Corridor Improvements Project. (Image courtesy of WSDOT)

(Image courtesy of WSDOT)

The Washington State Department of Transportation (WSDOT) will install sign bridges and toll structures on State Route 167 (SR 167). This work needs a full closure of the highway between 277th Street and West Willis Street/State Route 516 (SR 516) in both directions of SR 167. This 1.5-mile section will close Thursday at 10 p.m. through Friday at 4 a.m., with a detour in place.

Once complete, this will be part of the long-term plan to connect a 50-mile express toll-lane system between Lynnwood and Puyallup. This work is part of the

The following on- and off-ramps will also be closed:

  • West Willis Street/SR 516 on-ramp to southbound SR 167.
  • South 277th Street on-ramp to northbound SR 167.
  • Northbound SR 167 off-ramp to West Willis Street/SR 516.
  • Southbound SR 167 off-ramp to South 277th Street.

WSDOT crews will remove signs from Interstate 405 (I-405) southbound through Canyon Park, part of the .

Expect intermittent full I-405 closures during WSDOT’s Thursday overnight work

The plan is to have as little impact to drivers as possible, with lane closures beginning Thursday at 8 p.m. approaching State Route 527 (SR 527). At midnight, contractors will have intermittent full closures on I-405 to safely remove signs over the freeway, stopping traffic for up to 15 minutes.

All lanes will reopen Friday by 4:30 a.m. WSDOT plans to have similar late-night closures in April in both directions of I-405 at different locations.

Drivers on Mercer Island will have one less option to enter Interstate 90 (I-90) east beginning Thursday at 9 p.m. Contractors will shut down the East Mercer Way on-ramp to take measurements for the set to begin this summer.

This is a short three-hour closure, reopening by midnight on Thursday.

Nate Connors is a traffic reporter for KIRO Newsradio. Follow him on . Submit news tips here.

Chokepoints

asphalt truck SR 512...

51³Ô¹ÏÍø Staff

One lane open on SR 512 east after asphalt truck rollover

A rollover incident invoving an asphalt truck shut down eastbound SR 512.

1 day ago

WSDOT Construction Training (Photo: courtesy of Chris Sullivan)...

Chris Sullivan

Just what are these WSDOT workers doing?

Discover why WSDOT workers often appear to stand around during construction and their crucial roles in project efficiency.

2 days ago

WSDOT shutdowns I-405Renton to Bellevue Widening and Express Toll Lanes Project...

Nate Connors

Traffic alert: WSDOT postpones 5-day closure, some weekend work due to weather

WSDOT's upcoming shutdowns will impact drivers on State Route 18 and I-90.

2 days ago

crash spanaway dui...

Jonah Oaklief

Car catches fire in DUI crash, construction worker critically injured

A woman faces DUI charges after a crash in Spanaway injures a construction worker and halts work at the site.

4 days ago

sr 18 I-90...

Chris Sullivan

SR 18 under I-90 closes for 5 days: Major detours start Thursday

State Route 18 closes at 9 p.m. Thursday and won't reopen until 5 a.m. next Wednesday. That's slightly more than five days of frustration for drivers.

4 days ago

crash fatal belfair elementary...

51³Ô¹ÏÍø Staff

Patrol car involved in multi-vehicle fatal crash on SR 3 near Belfair Elementary

The Washington State Patrol is investigating a fatal multi-vehicle crash on State Route 3 near Belfair Elementary School.

5 days ago

Plan for traffic: WSDOT’s Thursday overnight work includes full SR 167 closure